Contents

 

1.Introduction

1.1. Scope of Inspection and Client Briefing

1.2. Aims and Limitations.

2. Summary and Recommendations.

3. Inspection.


EXTERNAL WORK

3.1. Main roof  – its surfaces, chimney, rainwater goods and  flashings.

3.2.  Secondary roof areas –

3.2.1.  New chapel.

3.2.2.  The side porch.

3.2.3.  Confessionals.

3.2.4.  The tower.

3.3   Walls and gables.

3.3.1.  Front gable

3.3.2 .West façade and tower walls.

3.3.3. South façade and new chapel walls.

3.4.    Windows and door schedule.

3.4.1.    Windows east façade- upper level

3.4.2.    Windows east façade- lower level

3.4.3.    Windows along north façade

3.4.4.    Windows along west façade – upper level

3.4.5.    Tower windows

3.4.6.    Windows along west façade – lower level

3.4.7.    Windows in south façade.

3.4.8.     Doors along the exterior.

3.4.8.a) Electrical cables & switch boards


INTERNAL WORK

3.4.9.    Internal doors.

3.4.10.  Gallery floor and Organ

3.4.11.  The tower timbers

3.4.12.  Main church roof – interior timbers.

3.4.13.  New side chapel    – interior timbers.

3.4.14.  Church interior    – exposed trusses.

3.4.15.  Church interior – Walls, floors,benches, Stations

3.4.16.  Church interior – Heating and radiators.

3.5.     Boundary wall gates and wrought iron work.

 

NOTE PAD.